Project: Ca Pass Tunnel Project

Investor: Deo Ca Investment JSC.
Location: Phu Yen and Khanh Hoa provinces
Service Description: Auxiliary Works Supervision & Equipment Installation Supervision Of BOT Section Package No. 20B

'Scale: The entire route is design by highway standard with the speed is 80km/h.
The first point of project is on Km1353+150 QL1A - Hao Son, Hoa Xuan Nam, Dong Hoa, Phu Yen. The last point is on Km1374+525 QL1A - Co Ma, Van Tho, Van Ninh, Khanh Hoa.
Total leghth of project is 13,190km in which Deo Ca tunnel is 4,125m length, Co Ma tunnel is 500m length, 6 bridges with the length is 1,200m and path route is 8,330m leghth.
Total leghth: 13.190 km
Total investment: 15.000 billion Vietnamese dong