Project: Construction of infrastructure of Vinh Loc industrial zone

Type of services: Survey Consultancy
Investor: Vinh Loc Industrial Zone One Member Limited Liability Company
Location: Ho Chi Minh City
Service Description: Verification of Category: Clearing block 56 / IIa and leveling ponds on 2D lines and items: 2D road

Total planning area
o Vinh Loc (phase 1): 203.18 ha
o Vinh Loc (extension): 56.06 ha

Rate of leased land:
o Vinh Loc (phase 1): 100% has been filled

The infrastructure:
o Transportation: Internal roads are complete
o Power supply: using 3 phases, power Binh Phu and Binh Chanh 15kv
o Water supply: underground water source of Vinh Loc Industrial Park and treated through wastewater treatment center of industrial park. Capacity of 5,000 m3 / day
o Contact information: 2 investors VNN, SPT
o Wastewater treatment: The wastewater treatment plant is under construction with an expected capacity of 6,000 m3 / day
o Land price: 250 USD / m2 / cycle (paid once or 3 times in 3 years)
o Electricity Price (not including VAT 10%)
   - Electricity service: 0,105 USD / KWh
   - Electricity: 0,07 USD / KWh
o Water price: USD 0.21 / m3 (including VAT 5%)