Project: Thanh Tri Bridge

Investor: Thang Long Project Management Unit
Location: Thanh Tri, Hanoi
Service Description: Quality inspection of pile

- Total investment: 5,700 billion Vietnamese dong (410 million USD) from ODA loans
- Loading capacity: H30 - XB80
- Scale: Total length is over 12,000 m, 33,10 m wide and with 6 lanes (4 fast lanes)
- Narrative: Thanh Tri Bridge is now considered the largest bridge of Indochina as well as the largest bridge in Project of 7 bridges of Hanoi acrossing Red river.