Project: Urban development for Dong Hoi resettlement area

Type of project: Civil projects
Investor: Thang Long Company Limitedg
Location: Lot 5B2,5B3,5B5 Dong Hoi resettlement area Dong Anh District Hanoi
Service Description: Master Planning, Feasibility Study Report, Basic design, Technical design, Cost estimation

- Total investment: 1,809 billion
- Land area: 22,829m2
- Construction density: 44%
- Heigh/Storeys: 3 floor Podium; 30-36 storey tower and 3 basements Floors